--- title: "Step 9A: Connecting 1 or 2 Products Using MeterBus" slug: "242-connecting-devices-with-meterbus" updated: 2025-10-17T18:25:42Z published: 2025-10-17T18:25:42Z canonical: "knowledgebase.morningstarcorp.com/242-connecting-devices-with-meterbus" stale: true --- > ## Documentation Index > Fetch the complete documentation index at: https://knowledgebase.morningstarcorp.com/llms.txt > Use this file to discover all available pages before exploring further. # Step 9A: Connecting 1 or 2 Products Using MeterBus > ![](https://cdn.document360.io/5c3867fe-b3a6-44b5-80c7-4bc7662cc267/Images/Documentation/image(65).png) **NOTE:** Make COM connections with no power applied. > ![](https://cdn.document360.io/5c3867fe-b3a6-44b5-80c7-4bc7662cc267/Images/Documentation/image(65).png) **ATTENTION:** Effectuez les connexions COM sans alimentation appliquée. ### Direct Connection Method Connect up to two products (Connected Products) to the ReadyEdge using the MeterBus RJ-11 cables included in the box. 1. Insert the plug on one end of a MeterBus cable (included) into ***MeterBus Port #1*** on the ReadyEdge. 2. Insert the plug on the other end of the RJ-11 cable into the MeterBus port of the Connected Product. 3. *IMPORTANT:* Change the DIP switch setting on the Connected Product to enable MODBUS serial protocol via the MeterBus port. The ReadyEdge cannot communicate with the Connected Product without MODBUS comms enabled! | Connected Product | DIP Switch to Enable MODBUS communication | | --- | --- | | ProStar | N/A - Protocol Auto-detect | | ProStar-MPPT | DIP 8 → ON | | SunSaver-MPPT | DIP 4 → ON | | SureSine Classic Inverter | DIP 4 → ON | 4. *OPTIONAL:* The ReadyEdge can only modify the Custom Settings of a Connected Product. If the Connect Product is configured to use one of the standard/non-custom settings, any changes to product settings made via ReadyEdge will not impact the product’s operation. If you want to have the ability to modify operational settings, be sure to configure the product’s DIP switch settings to “Custom” as follows: | Connected Product | “Custom” DIP Switch Settings | | --- | --- | | ProStar | DIPs 4,5,6 → ON position | | ProStar-MPPT | DIPs 4,5,6 → ON position | | SunSaver-MPPT | DIP 1 → ON (Custom Charge settings)** DIP 2→ ON (Custom Load settings) | | SureSine Classic Inverter | N/A - no custom settings support | ** *Keep the Battery Select jumper inserted. The ReadyEdge can only modify the “Gel” battery configuration.* > [!WARNING] > ![](https://cdn.document360.io/5c3867fe-b3a6-44b5-80c7-4bc7662cc267/Images/Documentation/image(66).png) ***CAUTION****: Make sure the custom settings are correctly configured for the system battery charging and load control requirements.* 1. Repeat steps 1-4 if you have a second Controller, connecting the MeterBus cable to ***MeterBus Port #2*** on the ReadyEdge. ### Connection(s) Using the TriStar-Meterbus Adapter Cable ![](https://cdn.document360.io/5c3867fe-b3a6-44b5-80c7-4bc7662cc267/Images/Documentation/TriStar-Meterbus Adapter Cable Wiring-Direct2 for RE manual(1).png) TriStar-Meterbus Adapter Cable to ReadyEdge Wiring (cable sold separately) 1. Insert the plug on one end of a MeterBus cable (included) into ***MeterBus Port #1*** on the ReadyEdge. 2. Insert the plug on the other end of the RJ-11 cable into the MeterBus Receptacle of the Adapter Cable. 3. Connect BOTH the MeterBus plug and RS-232 plug from the Adapter Cable into the TriStar family controller. 4. *Optional:* Change the DIP switches to CUSTOM setting on the Connected Product. This will enable the ReadyEdge to use and modify the Connected Product’s custom settings. You may choose to use one of the “standard” / non-customer DIP switch settings, but the Connected Product configuration cannot be modified by the ReadyEdge. 5. Repeat steps 1-4 if you have a second Controller, connecting the MeterBus cable to ***MeterBus Port #2*** on the ReadyEdge. | Connected Product | “Custom” DIP Switch Settings | | --- | --- | | TriStar | DIPs 4,5,6 → ON position | | TriStar-MPPT | DIPs 4,5,6 → ON position | > [!WARNING] > ![](https://cdn.document360.io/5c3867fe-b3a6-44b5-80c7-4bc7662cc267/Images/Documentation/image(66).png) ***CAUTION****: Make sure the custom settings are correctly configured for the system battery charging and load control requirements.* #### Need to Connect 3 or More Products via MeterBus? Refer to Appendix A: MeterBus Connections - 3 or More Products