--- title: "6.1 Maintenance Schedule" slug: "70-troubleshooting" updated: 2026-03-06T15:27:36Z published: 2026-03-12T18:30:24Z canonical: "knowledgebase.morningstarcorp.com/70-troubleshooting" --- > ## Documentation Index > Fetch the complete documentation index at: https://knowledgebase.morningstarcorp.com/llms.txt > Use this file to discover all available pages before exploring further. # 6.1 Maintenance Schedule Table 10 lists the recommended maintenance schedule to keep the GenStar MPPT performing optimally. > [!CAUTION] > ![Warning symbol indicating high voltage with a lightning bolt inside a triangle.](https://cdn.document360.io/5c3867fe-b3a6-44b5-80c7-4bc7662cc267/Images/Documentation/warning ISO(1).png) WARNING: RISK OF ELECTRICAL SHOCK > > No power or accessory terminals are electrically isolated from DC input, and may be energized with hazardous solar voltage. Under certain fault conditions, battery could become over-charged. Test between all terminals and ground before touching. > [!CAUTION] > ![Warning symbol indicating high voltage with a lightning bolt inside a triangle.](https://cdn.document360.io/5c3867fe-b3a6-44b5-80c7-4bc7662cc267/Images/Documentation/warning ISO(1).png) WARNING: SHOCK HAZARD > > Disconnect all power sources to the controller before removing the wiring box cover. Never remove the cover when voltage exists on the GenStar MPPT power connections. | **Schedule** | **Maintenance Items** | | --- | --- | | 2 weeks after installation | Re-tighten power terminal connections to specified torque values. | | 3 months after installation | Re-tighten power terminal connections to specified torque values. | | Monthly or After Each Equalization | Inspect the battery bank. Look for cracked or bulging cases, and corroded terminals. For wet cell (flooded type) batteries, make sure the water level is correct. Wet cell water levels should be checked monthly or according to the manufacturer's recommendations. | | Annually | Clean the heatsink fins with a clean, dry rag . Inspect all wiring for damage or fraying. Inspect for nesting insects. Re-tighten all wiring terminal connections to specified torque values. Inspect the system earth grounding for all components. Verify all grounding conductors are appropriately secured to earth ground. | Table 10. Maintenance Schedule. > [!CAUTION] > ![Warning symbol indicating high voltage with a lightning bolt inside a triangle.](https://cdn.document360.io/5c3867fe-b3a6-44b5-80c7-4bc7662cc267/Images/Documentation/warning ISO(1).png) WARNING: SHOCK HAZARD > > A means of disconnecting all power supply poles must be provided. These disconnects must be incorporated in the fixed wiring. Open all power source disconnects before removing controller wiring cover, or accessing wiring.