--- title: "2.6 Initial Configuration/Setup Wizard" slug: "commissioning-1" updated: 2026-03-11T18:17:57Z published: 2026-03-12T18:30:24Z canonical: "knowledgebase.morningstarcorp.com/commissioning-1" --- > ## Documentation Index > Fetch the complete documentation index at: https://knowledgebase.morningstarcorp.com/llms.txt > Use this file to discover all available pages before exploring further. # 2.6 Commissioning/Initial Configuration Commissioning requires the user to enter and confirm important settings required for basic operation. For all other settings, see Configuration Section 3 for complete details on LiveView and programming. These settings beyond commissioning can be made using LiveView, or the local meter (with some limitations). #### **Methodology** Commissioning can only be done via the local meter. #### **Commissioning Menu** The commissioning menu only appears on first start-up from the factory, and after a, "Factory Reset", of the GenStar MPPT. The directional arrows are used to navigate vertically and horizontally through the meter display map. In the commissioning menu, the right arrow is used to move to a screen to adjust the setting. #### **Stand-alone Commissioning Settings** The current GenStar operates only as a stand-alone controller, and must be programmed with preset or custom settings. The GenStar cannot currently be programmed to operate in a synchronized mode with other controllers in the system. The commissioning flowchart in Figure 9 illustrates the selectable options required to prepare the GenStar MPPT for operation or further programming. ![Flowchart illustrating steps for setting UTS time and battery profiles.](https://cdn.document360.io/5c3867fe-b3a6-44b5-80c7-4bc7662cc267/Images/Documentation/commisssiong flowchartai.png) *1 “RTS Required”, is the default setting. Once a unit is commissioned with this default, a subsequent change to, “RTS not required”, necessitates that the unit be recommissioned via a Factory Reset using the local meter - Installer Setup\Commands\Factory Reset. Also see RTS Start-up and Run-time Behavior Tables below.* Figure 9. Commissioning Flowchart. #### RTS START-UP and RUN-TIME Behavior Tables | **Start-Up Behavior** | **RTS Required -YES (Default Setting)** | **RTS Required - NO** **(Default must be changed in factory reset-new commissioning)** | | --- | --- | --- | | RTS not connected at start-up | Fault - no charging | Normal Charging using 25°C | | RTS connected at start-up | Normal charging using RTS temperature | Normal charging using RTS temperature | Table 3. GenStar MPPT Start-Up Behavior. | **Run Time Behavior** | **RTS REQUIRED - YES** **(Default Setting)** | **RTS REQUIRED - NO** **(Defaults must be changed in Installer Setup)*** | | --- | --- | --- | | RTS disconnected | Fault - no charging | CONTINUED CHARGING at 25°C ref. ALARM ET | | RTS reconnected | Clears fault, then normal charging using RTS temperature | Normal charging using RTS temperature | Table 4. GenStar MPPT Run-time Behavior.